The following is the cause of this error:
Both types of BC/AD indicators were listed in a date specification. If one of the BC/AD indicator format masks, such as BC or B.C., is specified in the date, the other may not be specified.
Action you can take to resolve this issue: Use one BC/AD indicator format, with or without periods, consistently.
Tags: Database, Microsoft, SQL, Oracle, Software, DBMS
Disclaimer:Pak/ed and the contributors are not responsible for any errors contained and are not liable for any damages resulting from the use of this material. Disclaimer
Home Disclaimer Advertise Contact Privacy Policy
Copyright © 2004-16 Paked.com. All rights reserved.
Note: Site best viewed at 1024 x 768 or higher screen resolution